Bathroom Remodeling — ModernCraft Construction

Bathroom Remodeling

Spa‑grade function in the hardest‑working room in the house.

Guest baths to primary‑suite retreats. Waterproofing done right is the part you never see and the part that matters most — we build showers and wet areas to last, then finish them beautifully.

What's included

  • Shower pans, waterproof membranes and wet‑area assemblies
  • Floor and wall tile, niches and curbs
  • Vanities, tops, sinks and fixtures
  • Plumbing and electrical updates, inspected to code
  • Glass, hardware, mirrors and accessories
  • Exhaust ventilation sized for the room
  • Workmanship warranty provided — inquire for details

The part you never see decides how long it lasts

Almost every failed shower fails for the same reason: water got behind the tile and had nowhere to go. Tile and grout are not waterproof. The waterproofing layer behind them is, and it is the single most consequential thing in a bathroom renovation — also the easiest to cut and the hardest for a homeowner to inspect afterwards.

That means a properly built shower pan with the correct slope to the drain, a continuous waterproof membrane at the walls and curb, sealed corners and penetrations, and no gaps where the substrate changes. Done right it is invisible for decades. Done poorly it looks identical on handover day and shows up two years later as a soft floor, a stained ceiling below, or grout that will not stay put.

What demolition usually finds

Bathrooms hide their history. Once the finishes come off we routinely find water damage around the tub or shower, rot in the subfloor near the toilet flange, previous repairs done without waterproofing, and in older homes, plumbing or wiring that will not pass current code.

None of that is visible during a walkthrough, which is why an honest bathroom quote separates the known scope from what may be behind the wall. We inspect after demolition and show you what is there before rebuilding, with the cost of addressing it agreed in writing before we proceed rather than added silently.

Small bathrooms and older housing stock

The 1940s–50s ranches and Cape Cods across the older Johnson County suburbs — Prairie Village, Fairway, Mission and their neighbours — tend to have a single small original bathroom with plaster walls, a cast iron tub and very little room to move fixtures.

Those are constrained projects rather than blank canvases, and the wins come from careful layout rather than square footage: a shallower vanity, a recessed niche instead of a bulkhead, a curbless or low‑curb entry, and lighting that makes a small room read larger. We would rather plan a small bathroom well than pretend it is a big one.

Common questions

How long is a bathroom out of service?
A typical full bathroom renovation runs a few weeks. Waterproofing and tile both need cure and set time that cannot be compressed without risking the result, so that portion of the schedule is fixed no matter how fast everything else moves.
What if you find water damage behind the wall?
We stop, show you, and price the repair in writing before continuing. Hidden conditions are excluded from the original quote precisely because nobody can see them at the walkthrough — you should never get an invoice for one you did not approve.
Can you do a curbless shower?
Often, though it depends on the floor structure and how much depth is available to build the slope. It is one of the first things we check during design rather than promising up front.
How we work

The bathroom remodeling process

  1. Design & selections

    We plan the layout and help you choose tile, fixtures, vanity and glass, then lock a fixed quote.

  2. Demolition

    Old finishes are removed and we inspect what’s behind the walls before rebuilding.

  3. Rough‑in & waterproofing

    Plumbing and electrical are updated, and proper waterproofing and shower pans are installed.

  4. Tile & surfaces

    Floor and wall tile is set, and the vanity, tops and fixtures go in.

  5. Glass, trim & finish

    Glass is hung, hardware set, and everything sealed and detailed.

  6. Walkthrough

    We test every fixture with you and complete the punch list together.

Related services
Where this work comes up most

These are the cities where bathroom remodeling is among the work the local building stock most often needs. We do it everywhere we work — see all service areas.

Free estimate

Let's build something that lasts.

Tell us about your project and we'll get back to you, usually within 48 hours.